From mboxrd@z Thu Jan 1 00:00:00 1970 Received: from walk.intel-email.com (walk.intel-email.com [101.227.64.242]) by mx.groups.io with SMTP id smtpd.web09.3020.1667870249324976304 for ; Mon, 07 Nov 2022 17:17:31 -0800 Authentication-Results: mx.groups.io; dkim=pass header.i=@byosoft.com.cn header.s=cloud-union header.b=UEe3/eiX; spf=pass (domain: byosoft.com.cn, ip: 101.227.64.242, mailfrom: gaoliming@byosoft.com.cn) Received: from walk.intel-email.com (localhost [127.0.0.1]) by walk.intel-email.com (Postfix) with ESMTP id DADC5CD1F80A; Tue, 8 Nov 2022 09:17:24 +0800 (CST) DKIM-Signature: v=1; a=rsa-sha256; c=simple/simple; d=byosoft.com.cn; s=cloud-union; t=1667870245; bh=Xz3P+vdVyOftbMcYNgJYbMeoxvc8dOq8hTr1euwnMwc=; h=From:To:Cc:Subject:Date; b=UEe3/eiXENOv7qT8c27zjj3lkmIxXTuNjcRA2kCD8abgXIAc/6THRKwx4r/qQcm9+ IIF7+KIF3BkgCMptlbjsNQQ7koHhE7aSw3cziWSzbshzbEz/6R8oNXV2bF7eltw6/7 XSo0PqhqHrW7d3LhVp72fdxyGI06eX8RzSa6DE5o= Received: from localhost (localhost [127.0.0.1]) by walk.intel-email.com (Postfix) with ESMTP id D6618CD1F801; Tue, 8 Nov 2022 09:17:24 +0800 (CST) Received: from walk.intel-email.com (localhost [127.0.0.1]) by walk.intel-email.com (Postfix) with ESMTP id A4715CD1F7FB; Tue, 8 Nov 2022 09:17:24 +0800 (CST) Authentication-Results: walk.intel-email.com; none Received: from mail.byosoft.com.cn (mail.byosoft.com.cn [58.240.74.242]) by walk.intel-email.com (Postfix) with SMTP id 62926CD1F7C4; Tue, 8 Nov 2022 09:17:18 +0800 (CST) Received: from DESKTOPS6D0PVI ([58.246.60.130]) (envelope-sender ) by 192.168.6.13 with ESMTP for ; Tue, 08 Nov 2022 09:17:14 +0800 X-WM-Sender: gaoliming@byosoft.com.cn X-Originating-IP: 58.246.60.130 X-WM-AuthFlag: YES X-WM-AuthUser: gaoliming@byosoft.com.cn From: "gaoliming" To: , Cc: "'Andrew Fish'" , "'Leif Lindholm'" , , "'Demeter, Miki'" Subject: Soft Feature Freeze start on 2022-11-07 for edk2-stable202211 Date: Tue, 8 Nov 2022 09:17:14 +0800 Message-ID: <026701d8f30f$d6322860$82967920$@byosoft.com.cn> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdjzD4DNiKDdks1OTCGOnfm2BhmVAA== Sender: "gaoliming" Content-Type: multipart/alternative; boundary="----=_NextPart_000_0268_01D8F352.E455DD90" Content-Language: zh-cn ------=_NextPart_000_0268_01D8F352.E455DD90 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Hi, all We enter into Soft Feature Freeze phase on 2022-11-07. In this phase, the feature under review will not be allowed to be pushed. The feature passed review can still be merged. The patch review can continue without break in edk2 community. If the patch is sent before Soft Feature Freeze, and plans to catch this stable tag, the patch contributor need reply to his patch and notify edk2 community. If the patch is sent after Soft Feature Freeze, and plans to catch this stable tag, please add edk2-stable202211 key words in the patch title and BZ, so the community know this patch target and give the feedback. Below is edk2-stable202205 tag planning Proposed Schedule https://github.com/tianocore/tianocore.github.io/wiki/EDK-II-Release-Plannin g Date (00:00:00 UTC-8) Description 2022-08-26 Beginning of development 2022-11-07 Soft Feature Freeze 2022-11-11 Hard Feature Freeze 2022-11-25 Release Thanks Liming ------=_NextPart_000_0268_01D8F352.E455DD90 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Hi, = all

 

We enter into Soft Feature Freeze phase on 2022-11-07. In = this phase,

the feature under review will not be allowed to be pushed. = The feature

passed review can still be merged.

 

The patch review can continue = without break in edk2 community. If the patch

is sent before Soft Feature Freeze, = and plans to catch this stable tag, the

patch contributor need reply to his = patch and notify edk2 community. If the

patch is sent after Soft Feature = Freeze, and plans to catch this stable tag,

please add edk2-stable202211 key = words in the patch title and BZ, so the

community know this patch target = and give the feedback.

 

Below is edk2-stable202205 tag planning Proposed = Schedule

https://github.com/tianocore/tianocore.github.io/wiki/EDK-I= I-Release-Planning

 

Date (00:00:00 UTC-8) Description

2022-08-26  Beginning of = development

2022-11-07  Soft Feature = Freeze

2022-11-11  Hard Feature = Freeze

2022-11-25  Release

 

Thanks

Liming

 

------=_NextPart_000_0268_01D8F352.E455DD90--